Watch it work What you get Time studies Standard work 5S audits Gemba walks Standard vs actual Ranked improvements Why Manvis Trust Who it is for
Watch it Talk to an expert

A Lean black belt in your pocket.

Manvis · new study
Manvis
+ New study
FOLDERS
Feeding Hopper · Line 3
Kitting walk path
Quebec plant
RECENT
Packaging line balance
Weld cell changeover
Receiving dock 5S
JDJordan Diaz
AI · LEAN BLACK BELT What do you want
to study?
Describe the process, or just drop in a video... Time study5S audit Make an SOPGemba walk Drop a clip anywhere. Phone, action cam, or a CCTV download.
Ranked improvements
Ranked improvements in Manvis, ordered by payback

Watch it work.

One clip. Manvis returns the cycle, the reach time and the three improvements worth doing first.

Play Product Showcase

The deliverables your team already trusts.

TIME STUDIES SOURCE · YOUR FOOTAGE
A time study in Manvis, every activity classified and timed

Manual study, or Manvis.

Conventional time studyWith Manvis
Sample coverage Twenty cycles, one stationExtrapolated across the shift, allowances applied by hand. Every cycle in the clipElement-level timing across the whole recording, no sampling.
Study lead time A day to observe, a day to write upPlus the wait for a clear observation window on the floor. The study returns the same dayUpload, classify, confirm, publish. No floor time booked.
Element classification By memory, against a clipboardValue and non-value called live, with no second pass. Proposed, then you confirmEvery element is yours to accept or change before it publishes.
Evidence and traceability Your notes, and your wordNothing to re-open when a number is challenged in review. The clip behind every numberEach element links to the second of footage it came from.
Re-validation after change The study goes in a drawerA layout change on Tuesday invalidates Monday's baseline. Bring a new clip, run it againRe-baseline a cell in minutes, and compare against the old standard.

One study, five readers.

The same clip answers a different question depending on who opens it.

See what each one gets

Get the shift back.

Fourty hours a week, from studying the work to actually ranking and improving it. Can be x10 with Manvis.

Studying the workOverheadImproving it
0h10h20h30h40h
Studying the work0 h

Time study, motion and flow analysis, line balancing, Gemba write-up. Manvis studies the footage instead, every cycle in the clip rather than the sample that actually gets checked.

Overhead0 h

PPAP records, compliance auditing, approvals, line stoppages. Real work, and none of it ours to move.

Improving it0 h

Kaizen events, layout optimisation, cycle-time reduction, poka-yoke design. SOPs and ranked improvements arrive in minutes, not the days a write-up used to take.

A CI team shift covers 10x more of the plant minimally, and a supervisor can get answers as well.

Study the work, not the worker.

Manvis studies the footage you bring, de-identifies people by default, and keeps the analysis on the process: cycle time, motion, standard work and waste.

An overhead view of an assembly station, the work in frame and the operator not identifiable
The station, not the person.
  • Built by SME Empowerment Co.
  • Member of ACET
  • Trusted by experts from Nissan Isothermic

Improvement should not be rationed.

We do not charge per user or per camera. A per-seat fee would tax the one thing we want spreading, so put it in front of everyone on the floor.

One subscriptionfor the whole team
Unlimited usersno per-seat line item
Any camerano per-camera fee

Bring one process.

We will study a real clip together. You see what comes back before you decide anything.

Vision, transferred.